"How do I handle an estimation question when there's no market to size?"
Candidates ask me this after meeting a prompt like "How many planes land at Delhi airport each day?" or "How long would it take to paint every room in this office building?" They've practised population × share × frequency × price until they can do it in their sleep. Then the question has no customers in it at all, and the usual chain doesn't fit.
The short answer: switch from the demand side to the supply side. Most non-market estimates are about how much something can produce, how long work takes, or what something costs to build. Each has its own simple structure. Learn those three, and the question becomes familiar again.
Below are the questions I hear most about this type of estimate, answered with worked examples.
What are the main types of non-market estimates?
You'll meet three most often.
Capacity questions ask how much a system can handle. Flights landing at an airport, cars passing through a toll booth, patients a clinic can see, meals a kitchen can serve.
Time questions ask how long a task takes. Painting a building, moving a library, cleaning a stadium after a match.
Cost questions ask what something costs to build, run or replace. A new metro line, running a hospital for a year, the fuel bill of an airline's fleet.
A fourth type comes up now and then: physical "how many fit" questions, like tennis balls in a bus. They use volume and packing, and they work the same way as capacity questions.
What's the structure for a capacity question?
Use this chain:
Number of units × capacity per unit per hour × hours of operation × utilisation
Utilisation is how busy the system is compared with its maximum. No airport runs every runway at full rate for 24 hours. Including utilisation is what separates a sensible estimate from a theoretical maximum.
Can you show a capacity example?
"How many flights land at a large international airport each day?"
"I'll estimate from runway capacity, because the number of landings is limited by runways, not by how many people want to fly."
- Assume the airport has two runways used for landings.
- A busy runway can handle roughly one landing every two minutes at peak, so about 30 an hour.
- Peak hours: about 16 hours a day are busy. Overnight, traffic is light, often limited by noise rules.
- Utilisation: even in busy hours, the airport won't hit the maximum every hour. I'll assume about 70%.
Calculation: 2 runways × 30 landings an hour × 16 hours × 70% ≈ 670 landings. Add a small number overnight, say 30, for about 700 landings a day.
Sanity check: if departures roughly match landings, that's about 1,400 flights a day in total. If an average flight carries 150 passengers, the airport handles about 200,000 passengers a day, or about 75 million a year. That's in the range of the world's busiest airports, so it fits for a "large international airport." For a mid-size airport, I'd assume one landing runway and get about half.
Notice that I checked the answer against a different measure (passengers). That's the move that earns the most credit.
What's the structure for a time question?
Use this chain:
Total amount of work ÷ rate of work per person ÷ number of people
Then add setup and finishing time, because real jobs have both.
The trick is choosing the right unit of work. For painting, it's square metres of wall. For moving books, it's boxes or shelves. For cleaning a stadium, it's seats or rows.
Can you show a time example?
"How long would it take a team of four painters to repaint every office in a 10-floor building?"
"I'll estimate the total wall area, divide by how fast a painter works, and then by the team size."
- Each floor has about 20 offices. That's 200 offices.
- A typical office is about 4 m × 4 m with 3 m ceilings. Wall area is 4 walls × 4 m × 3 m = 48 m². Minus windows and doors, about 40 m².
- Total: 200 × 40 = 8,000 m².
- Two coats doubles the work to 16,000 m².
- A painter covers about 20 m² an hour with a roller, including cutting in around edges.
- Hours: 16,000 ÷ 20 = 800 painter-hours.
- With four painters: 200 hours each.
- At 8 hours a day, that's 25 working days, or about five weeks.
Then adjust for reality: "Moving furniture and protecting floors probably adds 20%, so about six weeks. If offices must stay in use, the team can only paint at weekends or evenings, which could stretch it to several months."
That last sentence shows business sense. The interviewer may follow up with "How would you speed it up?" You've already spotted that the constraint might be access, not painters.
What's the structure for a cost question?
Break the cost into components, then estimate each one.
Total cost = sum of (quantity × unit cost) for each component
For a one-off project, split into big buckets like land, materials, labour and equipment. For running costs, split into staff, energy, supplies and maintenance, then multiply by time.
Can you show a cost example?
"What does it cost to run a 300-bed hospital for a year?"
"I'll split the cost into staff, which is usually the biggest item, and everything else."
Staff:
- Hospitals usually need several staff per bed once you count all shifts. I'll assume 4 per bed, so 1,200 staff.
- Average cost per staff member: assume ₹8 lakh a year, mixing doctors, nurses and support staff in an Indian private hospital.
- Staff cost: 1,200 × ₹8 lakh = ₹96 crore.
Everything else: medicines, consumables, energy, food, maintenance. I'll assume this roughly equals 60% of staff cost, so about ₹58 crore.
Total: roughly ₹150 crore a year.
Sanity check: that's ₹50 lakh per bed per year, or about ₹14,000 per bed per day. If average revenue per occupied bed is higher than that and occupancy is decent, the hospital is viable. That fits with what listed Indian hospital chains report in their results, where average revenue per occupied bed per day runs well above that figure.
Can I combine the structures?
Often you'll need to. A cost question frequently sits on top of a time question. If the interviewer follows the painting example with "What would the job cost?", you already have 800 painter-hours. Multiply by an hourly wage, add paint (16,000 m² at roughly 10 m² per litre is 1,600 litres), and you have a cost estimate in under a minute.
The same goes for capacity and cost. Once you know a kitchen can serve 400 meals a night, the next question is usually what it costs to run per meal. Keep your earlier numbers boxed on the page, because the interviewer will often build on them.
How do I pick the right structure when the question is vague?
Ask yourself what limits the answer.
- If it's the physical system (runways, seats, ovens, machines), use capacity.
- If it's effort (people working on a task), use time.
- If it's money spent, use cost components.
If two seem possible, pick the one you can defend best and mention the other as a check. "I could build this from passenger demand, but runway capacity is the real limit, so I'll start there."
What do interviewers look for in these questions?
The same things as in market sizing, with one extra.
- A clear structure stated before any numbers.
- Assumptions said out loud, with a reason.
- Clean maths with units.
- A sanity check against something else you know.
- The extra one: a practical constraint. Capacity questions need utilisation. Time questions need setup and access. Cost questions need the biggest cost driver named. These are what make an estimate feel real rather than theoretical.
What are the common mistakes?
Using theoretical maximums. Assuming 100% utilisation or no breaks gives an answer that's far too high.
Choosing the wrong unit of work. Painting "rooms" instead of square metres hides the difference between a cupboard and a boardroom.
Forgetting setup time. Real projects need preparation and clean-up.
Missing the binding constraint. If the office must stay open, the number of painters doesn't matter much. Access does.
How long should my answer take?
About five to seven minutes. Spend the first 30 to 60 seconds on structure, then move steadily through the numbers.
FAQ
Do consulting firms really ask non-market estimates?
Yes. They appear as stand-alone questions and inside cases, often in operations cases where capacity or time is the real issue.
What if I don't know a physical fact, like how fast a painter works?
Make a reasonable assumption and say it out loud. "I'll assume about 20 square metres an hour." Interviewers care about the logic, and they'll correct you if a number is far off.
Should I always do a sanity check?
Yes, even a quick one. Checking against a second measure, like passengers for the airport, is the step that earns the most credit.
Self-test
Try these three. For each, write the structure in one line before any numbers:
- Capacity: How many cars pass through a busy highway toll plaza in a day?
- Time: How long would it take to clean every seat in a 50,000-seat stadium after a match?
- Cost: What's the annual electricity bill of a large shopping mall?
Then check yourself. Did you include utilisation for the toll plaza? Setup and crew size for the stadium? The biggest energy user, probably air conditioning, for the mall? If yes to all three, you're handling non-market estimates well. For more estimates with model answers, use the market sizing practice set, which includes capacity, time and cost questions as well as classic market sizes.