"Operations cases are for engineers." I hear this from lawyers, doctors, finance people and liberal arts graduates, usually right before they tell me they're hoping not to get one.
That fear is misplaced. Operations cases use a handful of ideas, and none of them need technical training. If you can follow a queue at a ticket counter, you can solve an operations case. What you need is a clear picture of how work flows through a system, where it gets stuck, and what it costs.
Below I'll explain the four ideas that come up again and again, in plain words. Then we'll work through a factory case from start to finish.
The four ideas you need
1. Capacity: how much can each step handle?
Every operation is a series of steps. A factory mixes, bakes, packs and ships. A hospital admits, diagnoses, treats and discharges. An airport checks in, screens, boards.
Each step has a capacity, the most it can handle in a given time. A packing machine might handle 3,000 packs an hour. A security lane might screen 150 passengers an hour.
2. Bottleneck: the slowest step sets the pace
The whole system can only go as fast as its slowest step. That step is the bottleneck.
Think of a highway that narrows from four lanes to two. It doesn't matter how wide the road is before or after. Traffic moves at the speed of the two-lane stretch.
This is the single most useful idea in operations cases. If a client wants more output, adding capacity anywhere except the bottleneck does nothing.
3. Throughput: what actually comes out the end
Throughput is the amount the system produces in practice. It's usually lower than the bottleneck's rated capacity, because machines break down, shifts start late, and lines stop to switch products.
So when a client says, "Our line is rated for 4,000 units an hour but we only get 3,000," the gap is lost time. Finding where that time goes is often the cheapest fix.
4. Utilization: how busy are the assets?
Utilization is how much of the available capacity is being used. A machine that could run 20 hours a day but runs 10 is at 50% utilization.
Utilization matters for cost. Machines, buildings and salaried staff cost roughly the same whether they're busy or idle. So when utilization falls, cost per unit rises. When a factory is running near full, adding more demand can be very profitable, until you hit the ceiling and need new investment.
How these ideas show up in cases
Operations problems appear in several disguises:
- "We can't meet demand." Find the bottleneck, then options to expand it.
- "Our costs per unit are rising." Check utilization and lost time.
- "Deliveries are late." Map the steps, find where orders wait longest.
- "Should we build a new plant?" Check whether existing capacity is really maxed out first.
- "Our inventory is too high." Look at forecasts, order sizes and how long each step takes.
The approach is the same each time. Map the flow, find where it's stuck, quantify the problem, then fix the stuck point.
A worked factory case
"Our client makes biscuits at a single factory near Pune. Demand has grown, and the sales team says it could sell 400,000 packs a week. The factory currently produces about 300,000. The CEO wants to know how to close the gap, and whether a new factory is needed."
Step 1: Clarify
You ask: how many shifts does the factory run, and what are the main production steps?
The interviewer says: "Two eight-hour shifts, six days a week. The steps are mixing, baking, cooling and packing."
So the factory runs 2 × 8 × 6 = 96 hours a week.
Step 2: Structure
"To close the gap, I first want to find where the line is constrained. Then I'll look at options to raise output at that point: running it longer, running it better, or adding capacity. Only if those don't close the gap would I look at a new factory, since that's the most expensive option. I'd like to start by understanding the capacity of each step."
Step 3: Find the bottleneck
The interviewer gives you rated capacity per hour:
- Mixing can handle 6,000 packs an hour.
- Baking can handle 4,200 packs an hour.
- Cooling can handle 5,000 packs an hour.
- Packing can handle 3,500 packs an hour.
Packing is the slowest at 3,500 an hour. That's the bottleneck.
At rated capacity, packing could do 3,500 × 96 = 336,000 packs a week. But the factory only makes about 300,000. So there's lost time on the packing line too.
"Packing is the bottleneck. At full rated speed it could produce about 336,000 a week, but actual output is 300,000, so we're losing roughly 11% of packing time. Before buying anything, I'd want to know where that time goes."
Step 4: Find lost time
The interviewer says the packing line stops for about 40 minutes per shift for changeovers between biscuit varieties, plus occasional jams.
That's an easy win to explore. Fewer changeovers, through longer runs of each variety or faster switching, could recover most of the lost time and bring output close to 336,000. That's a gain of up to about 36,000 packs a week for little cost.
But it doesn't close the full gap. You're still about 64,000 packs short of 400,000.
Step 5: Options to expand the bottleneck
Now brainstorm ways to raise packing capacity, in a structure:
- Run longer: add a partial third shift or Sunday shift for packing only
- Run faster: upgrade the packing machine
- Add capacity: install a second packing line, or outsource some packing
Test the biggest option: a second packing line rated at 2,000 packs an hour. Total packing capacity becomes 5,500 an hour.
But now packing is no longer the slowest step. Baking, at 4,200 an hour, becomes the new bottleneck. The factory's capacity is 4,200 × 96 = about 403,000 packs a week.
"Adding a second packing line moves the bottleneck to baking, at about 403,000 packs a week. That just covers the 400,000 demand, with very little room to spare."
This is the insight interviewers love: fixing one bottleneck reveals the next.
Step 6: Recommend
"I recommend the client does not build a new factory yet. First, cut changeover time on the packing line, which could add up to around 36,000 packs a week at low cost. Then add a second packing line, which lifts capacity to about 400,000 packs a week, where baking becomes the limit. That meets current demand. Since there's little headroom left, if the sales forecast keeps growing, the next step is to plan for more baking capacity, either a new oven or a third shift, within the next year or two. A new factory only makes sense if demand goes well beyond that."
What the interviewer is listening for
In an operations case, the interviewer's notes usually come down to a few moments. Did you map the steps before guessing at fixes? Did you find the bottleneck with numbers, not intuition? Did you look for lost time before recommending new equipment? And did you notice when your fix moved the bottleneck somewhere else?
That last one separates strong candidates from good ones. Many candidates add a packing line, see that packing capacity now exceeds demand, and declare victory. The strong candidate checks the whole line again and spots baking.
The other moment that earns credit is cost awareness. Cheap fixes like cutting changeovers come before expensive ones like new lines, and a new factory comes last.
Supply chain cases: the same logic, stretched out
Supply chain cases cover everything that happens between the factory gate and the customer. They sound bigger, but the ideas carry over.
- Capacity: how many orders a warehouse can process per day
- Bottleneck: maybe trucks, maybe loading docks, maybe pickers
- Lead time: how long an order takes from placement to delivery
- Inventory: stock held at each point to cover delays and demand swings
A common supply chain question is the trade-off between cost and service. Holding more stock near customers means faster delivery but higher cost. Fewer, bigger warehouses are cheaper but slower. There's rarely a free lunch, so frame your answer as a trade-off and recommend based on what the client values more.
FAQ
Do I need an engineering background for operations cases?
No. You need a few ideas (capacity, bottleneck, throughput, utilization) and the habit of mapping the steps. The interviewer gives you any technical detail you need.
What's the first thing to do in an operations case?
Map the process: what are the steps, in order? Then ask for capacity at each step to find the bottleneck.
How do I handle technical terms I don't know?
Ask. "Could you explain what a changeover involves here?" is a perfectly good question. Interviewers prefer that to a guess.
Are healthcare operations cases different?
The ideas are the same, applied to patients instead of products. The healthcare operations case works through a patient flow example.
Practice prompt
Try this one with the four ideas in mind. Give yourself ten minutes.
"A popular passport office in a large Indian city has queues of four to five hours. It has five steps: token issue, document check, photo and fingerprints, officer verification, and payment. The government wants to cut waiting time to under one hour without hiring more officers."
Hint: start by asking for the capacity of each step. Then think about what you can change at the bottleneck without adding officers.
For more operations prompts with worked numbers, try the structuring drills on The Consulting Path.
Read next: MECE Explained With Examples You'll Actually Face; The Profitability Framework Is Not Wrong, You're Using It Wrong